深入的信息助您找到解决方案

我们愿为您选择最合适您项目的产品。您可通过不同的渠道了解更多罗宾斯产品。

项目成果

从项目的案例中可了解到罗宾斯过去和现在的项目进展。您可按照机器直径和机器类型进行筛选,选择合适的数据,符合需要的地质条件,供您作为下一个项目开展的信息。

根据隧道直径

请选择您想了解项目的隧道宽度(米)

根据机器类型

请选择您想了解项目的机器类型

项目成果


Moscow_Metro_Featured_Image

(English) Moscow Metro

(English) A Robbins EPB has commenced boring for Moscow Metro. Three additional Robbins EPBs, two new and one refurbished, will begin excavation between November 2012 and March 2013. All four machines are equipped with mixed ground cutterheads and Robbins continuous conveyor systems. Learn More

Shayler_Run_SBU_Rockhead_Lining

(English) Shayler Run Segment C Sewer Replacement Project

(English) A Robbins SBU-RHDS excavated seven crossings for a sewer system in Clermont County, Ohio. The new system will reduce the risk of pipe failure and protect the area’s environmentally-sensitive Shayler Creek. Learn More

Nanjing_Featured_Image

(English) Nanjing Metro Line 3 Lot 11 & Line 10 Lot 5

(English) Four Robbins 6.5 m EPBs are excavating for the Nanjing Metro, Line 3 Lot 11 and Line 10 Lot 5. Once completed, the new lines will accommodate increased passengers during the 2014 Youth Olympic Games, and will join additional new lines as part of the Nanjing Metro expansion project. Learn More

SBU-M_Iowa Force Main_2012_Thumbnail

(English) City of Clinton Contract B Force Main Project

(English) Robbins supplied 2 SBU-As and 1 SBU-M for three crossings in Clinton, Iowa, USA. Clinton is one of three towns in Iowa in desperate need of updated water treatment systems, and the tunnels will allow for improved water quality and reduced capacity in treatment plants. Learn More

SBU_Silver_State_2010_3

(English) Tahoe Forest Hospital District Central Energy Plant Prep Project

(English) A Robbins Mixed Ground SBU leaves a lasting impression on contractor Silver State Boring Inc. after it successfully bores three crossings directly under an active hospital in Truckee, California, USA. Learn More