Close Menu Close

最新消息

新闻及资讯 | 2020年1月 7日

Robbins unveils Largest Hard Rock TBM in the U.S. at Mill Creek

In December 2019, the City of Dallas, Texas, USA unveiled the largest hard rock TBM ever to bore in the U.S. The 11.6 m (38.1 ft) diameter Robbins Main Beam TBM will excavate the 8 km (5 mi) Mill Creek Drainage Relief tunnel. [...]

了解更多  >

In December 2019, the City of Dallas, Texas, USA unveiled the largest hard rock TBM ever to bore in the U.S. The 11.6 m (38.1 ft) diameter Robbins Main Beam TBM will excavate the 8 km (5 mi) Mill Creek Drainage Relief tunnel. [...]

了解更多  >

新闻及资讯 | 2019年11月27日

Two Robbins Crossover TBMs to Bore Second Severomuysky Tunnel

In 1979, a 4.56 m diameter Robbins Double Shield TBM was delivered to bore the Severomuysky Service Tunnel, a 15.3 km long railway through the remote mountains of Siberia. Now, 40 years after the original machine was delivered, Robbins is returning to the [...]

了解更多  >

In 1979, a 4.56 m diameter Robbins Double Shield TBM was delivered to bore the Severomuysky Service Tunnel, a 15.3 km long railway through the remote mountains of Siberia. Now, 40 years after the original machine was delivered, Robbins is returning to the [...]

了解更多  >

新闻及资讯 | 2019年9月 4日

Compact TBM bores longest Rock Tunnel at 2.46 m Diameter

In August 2019, a small diameter Double Shield TBM made a big impact. The 2.46 m (8.07 ft) diameter Robbins machine completed 3,475 m (11,400 ft) of boring with no intermediate access, making it the longest rock tunnel ever bored by a Double Shield TBM un [...]

了解更多  >

In August 2019, a small diameter Double Shield TBM made a big impact. The 2.46 m (8.07 ft) diameter Robbins machine completed 3,475 m (11,400 ft) of boring with no intermediate access, making it the longest rock tunnel ever bored by a Double Shield TBM un [...]

了解更多  >

新闻及资讯 | 2019年8月21日

Major Milestone for Delaware Aqueduct Repair as Robbins Single Shield Completes Excavation

On Tuesday August 13, a 6.58 m (21.6 ft) Robbins Single Shield TBM completed tunneling at the Delaware Aqueduct Bypass Tunnel, capping a challenging repair to the world's longest tunnel on time and on budget. [...]

了解更多  >

On Tuesday August 13, a 6.58 m (21.6 ft) Robbins Single Shield TBM completed tunneling at the Delaware Aqueduct Bypass Tunnel, capping a challenging repair to the world's longest tunnel on time and on budget. [...]

了解更多  >

新闻及资讯 | 2019年6月 4日

罗宾斯盾构机最后标段贯通顺利结束62公里墨西哥TEO污水隧道的施工

2019年5月23日,举行了一场庆祝活动:6台直径为8.93米的土压平衡盾构机中的最后一台在墨西哥城的伊米苏. 奥连特隧道(Emisor Oriente,简称TEO)的第4标段完成了挖掘工作,这一壮举标志着历时10 [...]

了解更多  >

2019年5月23日,举行了一场庆祝活动:6台直径为8.93米的土压平衡盾构机中的最后一台在墨西哥城的伊米苏. 奥连特隧道(Emisor Oriente,简称TEO)的第4标段完成了挖掘工作,这一壮举标志着历时10 [...]

了解更多  >

行业活动

五月 2019 3-9

2019世界隧道大会行业活动

意大利,那不勒斯

行业活动

六月 2019 16-19

2019快速开挖和隧道工程大会行业活动

美国,芝加哥

行业活动

十月 2019 1-3

2019国际建筑和公用设施设备博览会行业活动

美国,路易斯维尔

行业活动

十一月 2019 26-27

2019国际隧道技术及设备展行业活动

德国,法兰克福

整装待发

罗宾斯可以为您
提供攻克任何地质的开挖工具

硬岩地质

主梁式掘进机

软土地质

土压平衡盾构机

混合地质

跨模式掘进机

断裂硬岩地质

双护盾掘进机

带涌水断裂硬岩

单护盾掘进机